Integration Readiness
Prepare Signals, Sources, and Systems Before They Influence Operations
EdgeLink presents a structured readiness view for APIs, webhooks, gateways, devices, payload concepts, event readiness, and future Watchman validation.
What integration readiness means
Integration readiness is the state of a device, signal, vendor platform, or gateway being sufficiently prepared for governed inclusion in the ecosystem. Readiness is not a live score — it is a structured picture of what is known, what is classified, and what needs further preparation before trusted activation.
Readiness Domains
Each domain has distinct readiness requirements.
Device Readiness
The state of a device's identity, enrollment, firmware, health signal quality, and tenant binding preparation. A device is ready when its integration requirements are clearly mapped.
Gateway Readiness
The state of a local gateway's network configuration, protocol translation readiness, device aggregation capacity, and connectivity posture.
Vendor Readiness
The state of a vendor platform's API readiness, protocol compatibility, integration documentation quality, and authentication mechanism readiness.
Signal Readiness
The state of a signal source's event frequency, payload structure, classification, and labeling quality. A signal is ready when it can be routed, normalized, and governed.
Payload Normalization Readiness
The state of a payload's schema mapping, field standardization, and classification readiness for downstream consumption. No live normalization is performed here.
Operational Handoff Readiness
The state of preparedness for future handoff to field operations, Agent Link missions, or robotics workflows. No deployment is triggered by EdgeLink.
Governance Readiness
The state of a signal, device, or integration source's readiness to pass Watchman/Sentinel Core trust validation, permission envelope checks, and evidence requirements before runtime activation.
EdgeLink does not calculate live readiness scores, perform backend checks, process telemetry, or control devices. The readiness checklists are guidance. The device registry and the read-only intake are the parts that run.